advertisement before-navabar

Power Supply

             
  • NEA: 10359 MWh
  • Private Sector: 8070 MWh
  • India: 5645 MWh
  • Tripping: 0 MWh
  • Demand : 24074 MWh
  • Soure : NEA

Off Track

The Pioneer of ‘SAFA TEMPO’

Kathmandu- Dhumbarahi - Shree Gorakhnath Marg, House no. 187. There was a signboard of Pashupati Energy Company Limited on the roof. Another was stuck to the side- "Maya Khola Hydropower". The inner room of the second floor was open. Bijayman Sherchan welcomed us coming outside. We entered inside with the…


sidebar1
sidebar2
sidebar3
sidebar4
sidebar5
sidebar6
sidebar7

web
analytics